Retrofit

Home | Projects | Retrofit
MEP Project
Project Overview

Retrofit

Sharjah, UAE

Project Sharjah City Centre – Energy Refurbishment (4000 TR Cooling System)
Location Sharjah, UAE
Client Majid Al Futtaim

Sharjah City Centre – Energy Refurbishment (4000 TR Cooling System) | Sharjah, UAE

Client: Majid Al Futtaim

Sector: Commercial Retail Mall

Capacity: 4000 TR

Location: Sharjah, UAE

This project involved a large-scale HVAC energy refurbishment and centralized chilled water system upgrade for Sharjah City Centre and its extension. The scope focused on delivering a high-efficiency industrial cooling solution and turnkey MEP refurbishment, improving system performance, energy efficiency, and sustainability in line with LEED standards and UAE regulations.

  • Installation of 4 × 1000 TR water-cooled chillers
  • Installation of cooling towers for heat rejection optimization
  • Integration of 19 chilled & condenser water pumps
  • Installation of pressurization units and expansion tanks
  • Installation of MS ERW chilled water piping network
  • Installation of chemical dosing and side stream filtration systems
  • Supply and installation of SMDBs and MCC control panels
  • Integration of chiller plant manager (CPM) automation system

The project delivered a fully optimized centralized chilled water plant (4000 TR capacity) for high-traffic retail operations. Our engineering execution included:

  • BIM-based MEP coordination and heat load analysis
  • SCADA-ready automation and control integration
  • Energy-efficient HVAC system refurbishment
  • Precision MEP installation with ISO-certified standards
  • On-time turnkey delivery for commercial mall operations

SUSTAINABLE ENGINEERING

Engineering is more than technical precision — it is about problem-solving with purpose. Every system we design and build contributes to a stronger, smarter, and more sustainable future.